KINBOOST
KINBOOST diesel and gas generator sets: open, silent, mobile and containerized units in front of the factory

Power that shows up, starts up, and keeps running.

Diesel and gas generator sets across eight power bands up to 2000+ kW. Assembled and load-bank tested on the Weifang production floor in Shandong, then shipped to 60+ countries.

WEICHAI · YUCHAI · CUMMINS · PERKINS · VOLVO · MTU

0 – 2000+kW output, diesel and gas
60+Countries shipped to
48 hQuotation turnaround
100%Load-bank tested before dispatch

What happens before your set ships.

Your generator is built on a 26,000 m² floor in Weifang, where about 40 people work across three lines: sheet metal, welding, assembly, testing. We are not the largest plant in China and we are not going to pretend otherwise. What we can show you is the work itself: every stage photographed as it happens, a test report issued against your unit's serial number, and a floor you are welcome to walk before you order.

Customers and EPC contractors are welcome to watch their own set go through the load test before it ships.

See the floor, the lines and the test bay →
The production hall: rows of open and canopy sets on the floor, two technicians walking the aisle, export crates stacked along the wall
A long row of red diesel engines on base frames down the assembly hall, workbenches and parts racks along the wall
26,000m² of production floor at the works in Weifang
40People on shift across the three lines
3Lines: sheet metal, welding, assembly, testing
0Subcontracted steps between us and the build

Work out the real output

Hot thin air carries less oxygen. Pick your nameplate and site conditions; the reading is the power you can actually depend on.

Every KINBOOST set is load-bank tested before dispatch, and the derate curve in your datasheet comes from the same table you see here.

Nameplate output
03,000
2555
Usable output at site500kW
Altitude factor1.000
Ambient factor1.000

Reference conditions. Nameplate output is fully available at this site.

How we test and derate →

Four things a trading desk cannot give you.

There are cheaper sets on the market. These are the four things you are actually paying for, and each one is something you can verify before you pay a deposit.

Technician assembling an engine on the KINBOOST line in Weifang
01

One floor, not a call centre

26,000 m² of production floor in Weifang, with the test cells on the same site. You can ask for a video walkthrough of the line your set is on, at any point during production.

02

Every set is loaded before it ships

A minimum two-hour burn-in at rated load, witnessed and logged, with the report carrying the unit serial number. Not a start-and-idle check on the factory floor.

03

The documents travel with the machine

Destination certificates, test report, schematics, O&M manual and parts list are closed out during production, not chased after the container has sailed.

04

Parts and answers after the sale

Wear parts stocked for ten years and dispatched within 72 hours, and a named engineer who stays with your project from the first enquiry through commissioning.

Every set burn-in tested at rated loadTwo in-house test cellsThe same production crew for twelve years

Six steps from your load list to a set on site.

You always know which step you are on and what you receive at the end of it. No stage starts before the previous one is signed off.

  1. 01

    Load list and site conditions

    Send the loads, the duty (standby, prime or continuous), the destination port, and the altitude and ambient temperature on site. A photo of the intended room helps.

    We confirm the sizing basis in writing before quoting.

  2. 02

    Sized proposal

    You receive a datasheet-grade proposal: prime and standby output, derated output for your site, fuel burn at 75% load, dimensions, dry weight and the engine options we recommend.

    A document you can put in front of your own client.

  3. 03

    Contract and deposit

    Price, Incoterms, lead time and payment terms confirmed in the contract. Deposit received, production slot booked, and the delivery date stated in writing.

    A fixed date, not a range.

  4. 04

    Build and load-bank test

    Assembly, wiring and a minimum two-hour burn-in at rated load, with voltage, frequency and fuel burn logged throughout. You can attend or watch by video.

    A signed test report carrying your unit serial number.

  5. 05

    Destination documents

    Where the destination requires conformity assessment, the inspection is booked before the vessel is confirmed, and the certificate pack is closed before the container is sealed.

    A document set that clears the port without demurrage.

  6. 06

    Shipment and after-sales

    Loading photos, container and seal numbers, then tracking until arrival. Commissioning guidance and a ten-year wear parts stock behind the machine.

    One named contact from enquiry through to the first service.

Start at step one

Average first reply: inside 48 hours, in English or French.

Certified for the markets we ship to.

Conformity requirements are set by the destination, not by us. These are the schemes our sets are regularly certified under, and what each one actually covers.

Hover or tap a certificate to flip it.

CE Certificate scan
CEMachinery Directive 2006/42/EC
CEMachinery Directive 2006/42/EC

Attestation of conformity (Annex VIII) for diesel generator sets 20–2000 kW, assessed against EN ISO 12100, EN ISO 8528-13 and EN 60204-1. Valid to September 2029.

ISO 9001 Certificate scan
ISO 9001Quality management
ISO 9001Quality management

Registration 06924Q1085BR1. Plant-level quality system covering design, assembly and testing, valid to June 2027.

ISO 14001 Certificate scan
ISO 14001Environmental management
ISO 14001Environmental management

Registration 06924E10268R1. Environmental management system for engine and genset production, valid to June 2027.

ISO 45001 Certificate scan
ISO 45001Occupational health and safety
ISO 45001Occupational health and safety

Registration 06924S10402R11. OH&S management system across the production floor and test cells, valid to June 2027.

The questions buyers ask before the first order.

What is your minimum order quantity?

One unit. We build to order, so a single set is a perfectly normal order. Freight per unit drops sharply from two sets onwards, because two fit a 40 ft container.

How long is the lead time?

Stock configurations ship in 10 to 15 working days. Built-to-order sets with a named engine or alternator take 25 to 40 days, and we confirm the date in writing before deposit.

What payment terms do you accept?

T/T with 30% deposit and balance against bill of lading is standard. Irrevocable L/C at sight is accepted for orders above USD 100,000.

What does the warranty cover?

Eighteen months from bill of lading or 1,500 running hours, whichever comes first. Failures caused by the set are ours: we air-ship the part and talk your technician through the swap.

Can you build own-brand machines?

Yes. Your badge, your paint, your manuals and your branding on the controller. Custom tooling carries a minimum quantity, which we quote case by case.

Do you supply spare parts after the sale?

Every set ships with a parts list keyed to its serial number. We stock wear parts for ten years and quote a full consumables kit for the first service interval.

All buyer questions →

Tell us the load. We will send the specification.

Send the application, the output you need and the destination port. You get back a sized proposal with the full datasheet and a landed price, inside 48 hours.

  • A sized proposal with the full datasheet attached
  • Landed price quoted through to your port
  • A reply inside 48 hours, no obligation

Or reach us directly on WhatsApp. We reply in English and French.