Irrigation and Farm Generator Power: Seasonal Duty and Off-Grid Sizing
13 Oct 2026

Irrigation and Farm Generator Power: Seasonal Duty and Off-Grid Sizing

How to power irrigation and farm duty: size on the pump starting kVA, plan for a season of hard running with no grid, and keep the set in the lower to mid bands where most single pivots sit.

Read article →
Specifying Diesel Generators for a Rental Fleet: Portability, Telemetry and Turnaround
13 Oct 2026

Specifying Diesel Generators for a Rental Fleet: Portability, Telemetry and Turnaround

How to spec a rental generator fleet: trailer-mounted, lockable, telemetry-ready units in a small set of standard bands, so a set drops onto the next job with no rework and high utilisation.

Read article →
How to Size a Generator Set: A Step-by-Step Method for 20–2000 kW
13 Oct 2026

How to Size a Generator Set: A Step-by-Step Method for 20–2000 kW

Size a generator from the load up: total the running kW, add the largest motor start, pick the duty rating, apply site derating, then choose the enclosure. A repeatable method for 20–2000 kW sets.

Read article →
kVA vs kW: Why a Generator Is Rated in Both and What Each Means
13 Oct 2026

kVA vs kW: Why a Generator Is Rated in Both and What Each Means

kVA is apparent power, kW is real power, and power factor bridges them. Understand both ratings so the set you buy actually covers the load you measured.

Read article →
Generator Derating: How Altitude and Temperature Cut Your Available Power
13 Oct 2026

Generator Derating: How Altitude and Temperature Cut Your Available Power

Hot, thin air makes a generator produce less than its nameplate. Use the planning factors for altitude and ambient temperature to size the set you actually need.

Read article →
Generator Fuel Consumption: How to Estimate Diesel Burn per Hour
13 Oct 2026

Generator Fuel Consumption: How to Estimate Diesel Burn per Hour

Estimate diesel use from load and specific fuel consumption. A planning method for tank sizing and running cost, with the caveats that matter at part load.

Read article →
ISO 8528 Generator Ratings Explained: ESP, PRP and COP in Plain Terms
13 Oct 2026

ISO 8528 Generator Ratings Explained: ESP, PRP and COP in Plain Terms

ISO 8528 defines three generator ratings, ESP, PRP and COP. Understand what each allows so you buy the duty the site needs and pay the right price.

Read article →
Dual-Fuel Generators: How Gas-Diesel Blending Cuts Fuel Cost
13 Oct 2026

Dual-Fuel Generators: How Gas-Diesel Blending Cuts Fuel Cost

A dual-fuel set blends diesel with gas in the combustion chamber, substituting up to about 70% of the diesel with gas. Where gas is already on site, that cuts running cost without giving up diesel reliability.

Read article →
Generator Maintenance Schedule: The First 12 Months by Running Hour
13 Oct 2026

Generator Maintenance Schedule: The First 12 Months by Running Hour

A running-hour maintenance schedule keeps a diesel set reliable: daily checks, then 50, 250, 500, 1000 and 2000-hour services. Here is the framework, with the intervals confirmed against your engine manual.

Read article →
Generator Controller and AVR Settings: What to Set Before Commissioning
13 Oct 2026

Generator Controller and AVR Settings: What to Set Before Commissioning

Before a set is commissioned, the controller and AVR must be set to the site: voltage, frequency, power factor, start and transfer delays, and protection thresholds. Get these wrong and the set damages its own load.

Read article →
Storing a Generator Set for Months of Idle Time
13 Oct 2026

Storing a Generator Set for Months of Idle Time

A set parked for months degrades from inactivity faster than one that runs. Fog the cylinders, stabilise the fuel, keep the battery and review the storage plan before it stands down.

Read article →
Common Generator Faults and How to Read the Alarm Log
13 Oct 2026

Common Generator Faults and How to Read the Alarm Log

Most generator faults announce themselves first in the alarm log: overspeed, low oil pressure, overcrank, high coolant temperature, voltage faults. Learn what each means and the first thing to check.

Read article →
Spare Parts Planning: Building a Consumables List from the Serial Number
13 Oct 2026

Spare Parts Planning: Building a Consumables List from the Serial Number

A critical spares list tied to the set's serial number turns a minor fault into a quick fix instead of a long outage. Build it from the manual, stock the consumables, and keep the list with the set.

Read article →
How to Buy a Generator Set from China: The Buyer's Process from Enquiry to Commissioning
13 Oct 2026

How to Buy a Generator Set from China: The Buyer's Process from Enquiry to Commissioning

Buying a generator set from China is a process, not a product lookup. Send a real load list, read the quote by rated output not nameplate, witness the test, and confirm the documents before the container sails.

Read article →
Generator Lead Times, MOQ and Payment Terms: What a Chinese Supplier Expects
13 Oct 2026

Generator Lead Times, MOQ and Payment Terms: What a Chinese Supplier Expects

A built to spec set typically needs 15 to 35 days after deposit, longer for containerised or dual-fuel builds. Minimum order is usually one unit, payment runs 30 percent deposit with the balance before loading, and the Incoterm decides who owns the freight.

Read article →
Diesel vs Gas Generator Sets: Running Cost, Price and Which Wins
13 Oct 2026

Diesel vs Gas Generator Sets: Running Cost, Price and Which Wins

Diesel wins on reliability and fuel availability in almost every market. Gas wins on running cost where gas is cheap or free. The right choice is a fuel price times running hours calculation, not a brand preference.

Read article →
Open, Silent, Mobile or Containerised: Choosing the Build Form
13 Oct 2026

Open, Silent, Mobile or Containerised: Choosing the Build Form

Open frames are cheapest and need a shelter. Silent canopies cut noise for towns and occupied sites. Mobile sets move with the job. Containerised builds pack power, fuel and control into one weatherproof box for remote duty.

Read article →
Silent Generator dB(A): What the Noise Figure Really Means
13 Oct 2026

Silent Generator dB(A): What the Noise Figure Really Means

A 75 dB(A) rating means little until you know the distance and the reference. Noise falls about 6 dB(A) per doubling of distance, so the same set reads 75 dB(A) at 7 m and near 87 dB(A) at 1 m.

Read article →
New vs Used Generator Sets: Where the Real Cost Difference Sits
13 Oct 2026

New vs Used Generator Sets: Where the Real Cost Difference Sits

A used set costs less up front, but the saving disappears if the engine, alternator or controller is tired. Buy used only with a load-bank report, a hours and service history, and a clear spares position.

Read article →
SONCAP for Generators: What Nigerian Buyers Need Before the Container Sails
13 Oct 2026

SONCAP for Generators: What Nigerian Buyers Need Before the Container Sails

Nigerian imports need a SONCAP certificate backed by a Product Certificate from an approved body. The generator must carry the right rating label and test report, or the container is held at the port.

Read article →
PVoC for Kenya, Tanzania and the EAC: The Generator Document Checklist
13 Oct 2026

PVoC for Kenya, Tanzania and the EAC: The Generator Document Checklist

East African imports clear on a Pre-Export Verification of Conformity certificate issued by an authorised agent at the load port. Get the certificate before the container leaves, or it is rejected on arrival.

Read article →
SASO and SABER for Saudi Arabia: Certifying a Generator Consignment
13 Oct 2026

SASO and SABER for Saudi Arabia: Certifying a Generator Consignment

Saudi imports require SABER registration: a Product Certificate of Conformity and a Shipment Certificate. The generator must meet the declared standard and carry the right label before the shipment certificate is issued.

Read article →
Importing Generators into Africa: Demurrage, Bonded Storage and Where Costs Hide
13 Oct 2026

Importing Generators into Africa: Demurrage, Bonded Storage and Where Costs Hide

The generator price is the small number. Demurrage, terminal handling, bonded storage and clearing agency fees are where African imports run over budget. Plan the landed cost, not the ex-works price.

Read article →
Shipping a Generator Set: Container Loading, Packing and Insurance
13 Oct 2026

Shipping a Generator Set: Container Loading, Packing and Insurance

Most sets ship in a 20 ft or 40 ft container, secured on a steel skid with the controller protected. Choose FOB or CIF, confirm the packing method, and insure to the landed value, not the ex-works price.

Read article →
Hospital Backup Generator Requirements: 10-Second Start, ATS and Redundancy
12 Oct 2026

Hospital Backup Generator Requirements: 10-Second Start, ATS and Redundancy

What a hospital or clinic standby set must do: reach rated load within the code window, carry life-safety loads through an ATS, and stay redundant enough that one fault does not darken a ward.

Read article →
Construction Site Power: Sizing a Generator for EPC and Rental Fleets
11 Oct 2026

Construction Site Power: Sizing a Generator for EPC and Rental Fleets

How to size a generator for a construction or EPC site: mobile and trailer-mounted sets, fast transfer for tools, and the load swings that decide the band.

Read article →
Mining and Quarry Generator Sizing: Altitude Derating, Dust and Continuous Load
10 Oct 2026

Mining and Quarry Generator Sizing: Altitude Derating, Dust and Continuous Load

How to size a generator for a mine or quarry: apply altitude and ambient derating, size for prime duty and continuous load, and choose an enclosure that survives dust and remote service.

Read article →
Perkins Generator Selection Guide: 1100, 1300, 2000 and 4000 Series Explained
03 Oct 2026

Perkins Generator Selection Guide: 1100, 1300, 2000 and 4000 Series Explained

Compare Perkins 1100-4000 series by power band, duty and application, then see how KINBOOST builds them into open, silent and containerised sets.

Read article →
Cummins Generator Selection Guide: KTA19, QSK23 and QSX15 for Industrial and Standby Duty
03 Oct 2026

Cummins Generator Selection Guide: KTA19, QSK23 and QSX15 for Industrial and Standby Duty

A practical way to choose between Cummins QSB, QSX15, KTA19, QSK23 and QSK38 families, with the duty, cooling and fuel questions that actually change the build.

Read article →
Yuchai Generator Buying Guide for Africa and Southeast Asia
03 Oct 2026

Yuchai Generator Buying Guide for Africa and Southeast Asia

What to check before you buy a Yuchai-powered set: the series naming, the emissions variant, the alternator and controller, and the parts question that decides downtime.

Read article →
Weichai Generator Guide: WP and Baudouin Platforms for Prime Power
03 Oct 2026

Weichai Generator Guide: WP and Baudouin Platforms for Prime Power

Weichai engines and the Baudouin partnership cover small prime power through large industrial sets. What the platform names mean, and when the economics favour them.

Read article →
Shangchai 135 Series Generator Sets: Sizing, Ratings and Spare Parts
03 Oct 2026

Shangchai 135 Series Generator Sets: Sizing, Ratings and Spare Parts

The Shangchai 135 series is a common choice for mid-power sets. How to size it correctly, read its ratings, and keep spares available without overstocking.

Read article →
The load-bank test report: five lines buyers should actually read
28 Aug 2026

The load-bank test report: five lines buyers should actually read

Every set we ship comes with a load-bank report. Here is how to read the five rows that tell you whether the machine you bought is the machine you were promised.

Read article →
Sizing for 60 Hz sites: why derating is not optional above 40 °C
12 Aug 2026

Sizing for 60 Hz sites: why derating is not optional above 40 °C

Ambient temperature and altitude quietly take power away from your set. A worked example from a 45 °C site in West Africa.

Read article →
SONCAP and PVoC in 2026: document checklist for African imports
30 Jul 2026

SONCAP and PVoC in 2026: document checklist for African imports

Destination certificates decide whether your container clears or demurrage starts ticking. The exact document set we prepare for Nigerian and Kenyan consignments.

Read article →

Prefer to read by decision, not by date?

The same thirty-six guides, filed under sizing, maintenance, compliance, engine platforms and site conditions.

Browse the guides